Fresh Concrete Field Testing
Document the concrete and placement conditions before the material becomes part of the structure.
- Sampling and specimen preparation
- Slump and temperature
- Air content and unit weight
- Field curing and chain of custody
Concrete 101Client login Concrete testing · Puerto Rico
Independent field observation, laboratory verification, and engineering guidance organized to support compliance, schedule, and documented acceptance.
Request testing
Capabilities
Testing scopes are selected from the project specifications and applicable procedures. Not every method applies to every project; Segarra coordinates the right work before the placement begins.
Document the concrete and placement conditions before the material becomes part of the structure.
Controlled specimen handling and testing support for defensible acceptance decisions.
Use temperature history and a project-specific relationship to estimate concrete strength development in place.
Evaluate transport and performance characteristics that influence concrete service life.
Collect useful information about in-place concrete while limiting disruption to the structure.
Technical support for permeable concrete systems where mixture, placement, and performance must work together.
Independent, engineering-led organization of the people, procedures, documentation, and decisions behind compliance.
Practical technical guidance for owners, designers, contractors, producers, and project teams.
Document constituent materials that influence concrete consistency, strength, and acceptance.
Move field and laboratory information through a secure, organized reporting path built for timely decisions.
Public record
Published project research credits Segarra Engineering with concrete laboratory testing that included aggregate gradation, air content, temperature, compression, and slump evaluation.
Omnant documents the company’s electronic reporting workflow, ASTM-aligned records, faster customer delivery, and secure test-data management.
How scopes are built
Confirm specifications, acceptance criteria, schedule, quantities, and responsible parties.
Define field coverage, laboratory work, specimen handling, and communication paths.
Connect observations, samples, procedures, results, and decisions in a traceable record.
Plan your next placement
Share the project, location, placement date, and testing requirements. We’ll help coordinate the next step.