Concrete testing · Puerto Rico

Test the material.
Protect the decision.

Independent field observation, laboratory verification, and engineering guidance organized to support compliance, schedule, and documented acceptance.

Request testing
Standard 6-by-12-inch concrete cylinder in a laboratory compression-testing machine
Field conditions, specimens, methods, results, and decisions connected in one documented path.

Capabilities

From fresh concrete to documented performance.

Testing scopes are selected from the project specifications and applicable procedures. Not every method applies to every project; Segarra coordinates the right work before the placement begins.

01

Fresh Concrete Field Testing

Document the concrete and placement conditions before the material becomes part of the structure.

  • Sampling and specimen preparation
  • Slump and temperature
  • Air content and unit weight
  • Field curing and chain of custody
ASTM C31 · C172 · C143 · C1064 · C231 · C138
02

Strength Verification

Controlled specimen handling and testing support for defensible acceptance decisions.

  • Compressive-strength cylinders
  • Cores and project-specific specimens
  • Result review and documentation
  • Strength trend coordination
ASTM C39 · C42 · Project specifications
03

Maturity & In-Place Strength

Use temperature history and a project-specific relationship to estimate concrete strength development in place.

  • Maturity planning and sensor coordination
  • Temperature-time monitoring
  • Strength-maturity correlation
  • Placement and early-age decision support
ASTM C1074 · Project protocols
04

Durability & Permeability

Evaluate transport and performance characteristics that influence concrete service life.

  • Permeability and resistivity support
  • Durability-oriented testing
  • Mixture-performance review
  • Project-specific acceptance criteria
Applicable ASTM · AASHTO · Project protocols
05

Non-Destructive Evaluation

Collect useful information about in-place concrete while limiting disruption to the structure.

  • Windsor Probe evaluation
  • In-place strength investigation
  • Condition-assessment support
  • Targeted testing plans
ASTM C803 · Applicable NDT procedures
06

Pervious Concrete

Technical support for permeable concrete systems where mixture, placement, and performance must work together.

  • Mixture and placement consultation
  • Fresh-property observations
  • Density and infiltration support
  • Construction-quality review
ACI · ASTM · NRMCA guidance
07

Quality-Control Programs

Independent, engineering-led organization of the people, procedures, documentation, and decisions behind compliance.

  • Quality-control planning
  • Inspection and testing coordination
  • Specification and submittal review
  • Nonconformance and corrective-action support
Contract requirements · Agency procedures
08

Concrete Engineering Consulting

Practical technical guidance for owners, designers, contractors, producers, and project teams.

  • Mixture and material review
  • Paving and constructability support
  • Concrete problem investigation
  • Technical training and presentations
Engineering judgment · Industry standards
09

Aggregate & Material Testing

Document constituent materials that influence concrete consistency, strength, and acceptance.

  • Aggregate gradation and sieve analysis
  • Material sampling coordination
  • Test-result documentation
  • Support for mixture evaluation
Applicable ASTM procedures · Project specifications
10

Digital Reporting & Client Access

Move field and laboratory information through a secure, organized reporting path built for timely decisions.

  • Electronic field and laboratory reports
  • Traceable project and specimen records
  • Rapid report delivery by email
  • Customer access through Omnant
Omnant laboratory information management · Applicable ASTM reporting

Public record

Capabilities supported by documented work.

Published project research credits Segarra Engineering with concrete laboratory testing that included aggregate gradation, air content, temperature, compression, and slump evaluation.

Omnant documents the company’s electronic reporting workflow, ASTM-aligned records, faster customer delivery, and secure test-data management.

How scopes are built

The method follows the requirement.

01

Review

Confirm specifications, acceptance criteria, schedule, quantities, and responsible parties.

02

Coordinate

Define field coverage, laboratory work, specimen handling, and communication paths.

03

Document

Connect observations, samples, procedures, results, and decisions in a traceable record.

Plan your next placement

Need concrete testing?

Share the project, location, placement date, and testing requirements. We’ll help coordinate the next step.